Maximum Authorised Load / Speed

Maximum authorised load depending on speed:

Lead Screw Maximum Load Formula

Lead Screw Max Load Formula Key

circumferential speed
vc [m/min]

load factor
fL [-]

5

0.95

10

0.75

20

0.45

30

0.37

40

0.12

50

0.08

 

Example

Speedy 10/50 with non-preloaded POM-C nut, d0 = 10 mm, p = 50 mm
and C0 = 1250 N;

required moving speed vS = 200 mm/sec.

We need to find: Fper.

We calculate n [min-1],

 Lead Screw Maximum Authorised Load / Speed Formula

circumferential speed vC [m/min]

Lead Screw Maximum Authorised Load / Speed Formaula

and find load factor fL in above table:

fL at vC of 7.53 m/min ≈ 0.85 [-]

It follows: Fper. = C0 · fL = 1250 · 0.85 = 1062.5 N

In other words, the maximum load for a Speedy 10/50 at vS = 200 mm/sec. (Small Arrow n = 240 min-1) is 1060 N.

Home
Christmas Opening Times
Ball Screws/BallScrew Repair
Lead Screws
Rondo Round Thread Screws
Nut Types
Introduction To Lead Screws & An Introduction to Speedy High Helix Lead Screws
Why Eichenberger Lead Screws?
Speedy Lead Screws
Technical Data (Overview)
Basic Calculations
Maximum Authorised Load / Speed
Handling & Installation Considerations
Calculations At Dynamic Load
Technical Basics
Complimentary Products
Acme/Trappezoidal
Job Vacancies
About Us
Information
 Copyright 2004 Moore International Ltd Unit 12, Cortry Close,  Poole, Dorset BH12 4BQ Tel. 01202 743222 Fax 01202 739955  Email Us


Powered By Intergage - www.intergage.co.uk